Quick answer

What do the main battery and tariff terms mean?

This glossary explains battery and energy terms in plain English, from arbitrage, spread and round-trip efficiency to G98, G99, SEG, VPP and the Scottish network operators. If a surveyor, installer or energy supplier uses a word you do not recognise, look it up here before you compare quotes or tariffs for your home.

Last updated:

Arbitrage
Buying energy cheaply and using or selling it when prices are higher.
BESS
Battery Energy Storage System. A large-scale battery installation, typically above 1MWh.
DNO
Distribution Network Operator. The company that manages the local electricity grid. In Scotland: SP Energy Networks (central/south) or SSEN (north/Highlands/islands).
G98
The grid connection notification process for small-scale generation (up to 16A per phase, typically under 3.68kW).
G99
The grid connection notification process for larger generation above the G98 threshold.
kWp
Kilowatt peak. The maximum output of a solar panel under standard test conditions.
kWh
Kilowatt hour. A unit of energy. One kWh powers a 1kW appliance for one hour.
MCS
Microgeneration Certification Scheme. The UK quality mark for renewable installers. An MCS-certified installation is required to receive SEG export payments.
EPC
Energy Performance Certificate. A rating of a property's energy efficiency from A (best) to G (worst).
SEG
Smart Export Guarantee. A UK scheme requiring energy suppliers to pay for exported renewable electricity. Published flat rates ran roughly 1p to 25p per kWh in 2026.
RTE
Round-Trip Efficiency. The percentage of energy recovered from a battery after charging losses. Typically about 88% for AC-coupled systems.
VPP
Virtual Power Plant. A network of distributed batteries and other assets aggregated and controlled as a single flexible resource.
Octopus Agile
A variable time-of-use tariff with half-hourly pricing. Widely used for battery arbitrage because prices change every half hour.
Intelligent Octopus Go
An Octopus tariff with a fixed cheap overnight window, designed around a compatible electric vehicle or charger.
Spread
The gap between the cheapest and most expensive electricity prices in a day. A wider spread gives a battery more to work with.
Peak and off-peak
Peak is when electricity is most expensive, usually late afternoon to early evening. Off-peak is when it is cheapest, usually overnight.
Inverter
The unit that converts the battery's direct current into the alternating current your home uses, and back again when charging.
AC-coupled and DC-coupled
AC-coupled batteries have their own inverter and are easy to add to an existing home or solar system. DC-coupled batteries share a hybrid inverter with solar panels.
SP Energy Networks
The network operator for central and southern Scotland, including Glasgow, Edinburgh, Fife, the Borders and Dumfries and Galloway.
SSEN
Scottish and Southern Electricity Networks. The network operator for the north of Scotland, including the Highlands, Aberdeenshire, Moray and the islands.
Tenement
A traditional Scottish block of flats, usually sandstone or granite, sharing a close and stair. Batteries here often run on grid arbitrage without solar.
Harling
A rough lime or cement render common on Scottish houses. It affects how wall-mounted equipment and cable routes are fixed.
Off-gas home
A property not connected to the mains gas network, typically heated by oil, LPG or electricity. Common in rural Scotland and on the islands.
Outgoing Octopus
An export tariff paying a flat 12p/kWh for exported solar/battery energy from 1 March 2026.
LiFePO4
Lithium iron phosphate. A battery chemistry known for safety, long cycle life, and thermal stability.
TrustMark
The government-backed quality mark for trades. Provides dispute resolution and consumer protection.
eBuildingStandards
The Scottish online portal for building warrant applications.
Triad
The three highest half-hourly demand periods on the UK grid between November and February. Commercial batteries can avoid peak charges by discharging during Triads.